Dangote Refinery 2021
Equipment Based Grouting

Project Overview

Large-scale precision grouting for critical refinery equipment foundations at the Dangote Refinery. Works included non-shrink grout installation for compressors, vessels, and structural column bases under tight tolerances.

Scope of Work

  • Non-shrink grout supply and placement
  • Equipment base grouting
  • Anchor bolt pocket grouting
  • Dimensional and strength verification
Discuss a similar project

Site Gallery

Photographs from the Equipment Based Grouting works on site.

Grouting works around a compressor skid foundation at the refinery
Crew placing non-shrink grout under a machine base plate
Operatives mixing MasterFlow non-shrink grout on site
Grout mixing and placement team at the equipment plinth
Formwork and placed grout at the skid edge
Compressor skid supported on levelling nuts before grouting
Anchor bolt and base plate detail with formwork in place
Completed grout bed beneath the Solar Turbines compressor skid
Finished grouting along the length of the equipment base
Grouting of a gearbox base plate within the plant structure
Operative fixing formwork around a gearbox base before grouting
Timber formwork built around the drive gearbox base plate
Prepared gearbox base plate ready for non-shrink grout
Sealing the formwork edges at the gearbox foundation
Completed formwork box around the machine base awaiting pour
Drive unit and plinth within the mill structure before grouting
Wide view of the equipment foundation and access works
Machine base on levelling packs above the concrete plinth
Base plate on steel shim packs prior to grout placement
Close view of anchor bolts and shim packs under the base plate